300w Wind Solar Hybrid Street Light The Tower Foundation for CXF-300W

300w Wind Solar Hybrid Street Light The Tower Foundation for CXF-300W

300w Wind Solar Hybrid Street Light The Tower Foundation for CXF-300W

Product Details:

Place of Origin: China
Brand Name: TYPMAR
Certification: CE,ISO,IEC
Model Number: CXF-300W

Payment & Shipping Terms:

Minimum Order Quantity: 1 unit
Packaging Details: Plywood
Delivery Time: 7 working days
Payment Terms: L/C, T/T, Western Union, MoneyGram
Supply Ability: 200 unit per month
Detailed Product Description
Material: Steel & Cement Safety: High

 

300w Wind Solar Hybrid Street Light The Tower Foundation for CXF-300W

 

 
I, Foundation Guide for CXF-300W

 

Before construction the foundation for the CXF-300W system, read these instructions carefully. These instructions are only intend to be guide for concrete foundation on solid soils or suitable roof infrastructure. Please contact your local civil or structure engineer for more information.

 

1. Street light positioning (location)
2. Digging the foundation of well (light tower, batteries)
3. Installation of ground wire, foundation cage
4. Pour concrete (40% ~ 50%)
5. Install battery lead hose
6. Pour concrete (100%)
7. Install the battery
8. Assemble the fan
9. Light tower parts assembly (connect fan, solar panels, LED lights and lanterns)
10. lifting
11. Debugging (light tower, solar panels, lights and lanterns)
12. Install the controller
13. Clean up the site
 
 
II, Ground Foundation

 

 

Add the concrete, using a vibration poker to remove air voids from the pour. It is very important to make sure that the all four rods are hooked under the rebar. Once the concrete is all poured, make sure that the template has no air voids directly underneath. More importantly, make sure the template is leveled off.

Next, clear excess concrete from above template and use a suitable cover to prevent the foundation from rain. Wait until the concrete has set complete before removing the template (It will take at least for one week).  Just remember, a solid with perfect leveled foundation is one of the key factors to achieve the success of installation.


 

Shenzhen TYPMAR Wind Energy Technology Co.,Ltd
Add: 4F,F Bldg, The 3rd Industrial Area of Phoenix,Pioneer Park,Fuyong Town,Baoan Dist.,Shenzhen,China.
China Good Quality Maglev Wind Turbine Supplier. Copyright © 2009 - 2020 typma.com. All Rights Reserved.